Commercial HVAC Contractors in Los Angeles

Commercial HVAC is heating, ventilation and air-conditioning work on offices, shops, restaurants and other non-residential buildings. In Los Angeles, hire a contractor with an active CSLB C-20 license and experience with your building type.

Los Angeles commercial HVAC at a glance

LADBS issued 2,909 commercial HVAC permits from November 2025 to October 2026. The count covers mechanical permits that LADBS labels Commercial, so apartment and one- or two-family permits are left out.

MeasureValue
Commercial HVAC permits, last 12 months2,909 from November 2025 to October 2026, as of Nov 21, 2026
Latest permit date in our dataNov 21, 2026
Busiest ZIP code90067, with 147 permits, as of Nov 21, 2026
Equipment named mostVRF / split / ductless, on 7.8% of permits, as of Nov 21, 2026
Next EBEWE audit deadlineDecember 1, 2026, for Building IDs ending 0 or 1 (checked October 29, 2026)

LADBS mechanical permit records state no job cost and name no contractor, so this page shows no cost chart and no company ranking. Source: LADBS permit records.

Start with your building and work scope

Tell bidders what the building is used for, which equipment serves it and what is wrong. Bidders who see the same facts can price the same work.

Request detailWhat to provide
LocationProject address and ZIP; this may differ from your company address
Building useOffice, retail, restaurant, medical office, warehouse or other
WorkRepair, replacement, new installation or maintenance agreement
EquipmentPackaged rooftop unit, split or VRF system, air handler, kitchen hood, chiller or unknown
Timing and accessNeeded date, occupied hours, roof access and shutdown limits

Restaurants should add the hood type and cooking line, because the hood is part of the HVAC permit scope.

Los Angeles commercial HVAC permits by month

LADBS issued about 242 commercial HVAC permits a month from November 2025 to October 2026. The busiest month was March 2026 with 269.

Permits issued by month, November 2025 to October 2026
Show the numbers (12 rows)
MonthPermits
Nov 2025198
Dec 2025240
Jan 2026221
Feb 2026228
Mar 2026269
Apr 2026256
May 2026246
Jun 2026238
Jul 2026251
Aug 2026252
Sep 2026248
Oct 2026262

What this means for you: Filings held between 198 and 269 a month, with no summer peak, so there is no slow season to wait for. Plan around your building's occupancy instead.

Los Angeles commercial HVAC permits by ZIP code

ZIP 90067 had the most, with 147 permits (5.1%) from November 2025 to October 2026.

Permits by ZIP code, November 2025 to October 2026
Show the numbers (11 rows)
ZIP codePermitsShare
900671475.1%
90045903.1%
90064742.5%
90012712.4%
90071692.4%
90026632.2%
90272632.2%
90048572.0%
90017551.9%
90038531.8%
All other ZIPs2,16774.5%

What this means for you: The top 10 ZIP codes together had only a quarter of all permits (742 of 2,909), led by 90067 in Century City. Work is spread across the city, so ask each bidder where its recent jobs were.

Equipment named on Los Angeles permits

VRF / split / ductless is the equipment type named most often, on 228 permits (7.8%). A further 83.3% of permit descriptions name none of the six equipment types we match. Types that no permit names are left out.

Share of permits naming each equipment type, November 2025 to October 2026
Show the numbers (7 rows)
EquipmentPermits naming itShare
VRF / split / ductless2287.8%
Heat pump1154.0%
Air handler (AHU)943.2%
Rooftop unit (RTU)622.1%
Chiller220.8%
Boiler160.6%
Other (none of these named)2,42283.3%

What this means for you: VRF and split systems were named most (228 permits), ahead of heat pumps (115). Only 62 permits named a rooftop unit, so if you are replacing one, ask for rooftop-unit references specifically.

We match words in each permit description. A permit can name more than one type, so shares add to more than 100%. An RTU is a rooftop unit, VRF is variable refrigerant flow, and AHU is an air-handling unit. Our October 2025 through September 2026 review also found kitchen hoods on 258 Commercial permits.

Which Los Angeles buildings get HVAC permits

Offices, shops and restaurants account for most commercial HVAC permits in the city. In a one-off review of permits from October 2025 through September 2026, we matched 2,545 of the 2,923 Commercial permits to a parcel with LADBS commercial building permits and used the building use those permits state most often.

Building use on the parcel's building permitsHVAC permitsShare of matched
Office71127.9%
Retail41216.2%
Restaurant, take-out, food commissary or catering40215.8%
Medical office823.2%
Warehouse632.5%
School building481.9%
Airport building421.7%
Other uses78530.8%

Office, retail and restaurant parcels draw the most HVAC permits. For a medical office or school, ask bidders for references from the same building type.

Building useExpress PermitsMost named work
Office84.2%Ductwork (213 of 711), exhaust or fans (109)
Retail76.5%Ductwork (115 of 412), exhaust or fans (74)
Restaurant and food service72.9%Kitchen hood (102 of 402), exhaust or fans (86)
Medical office76.8%Ductwork (26 of 82)

Restaurant jobs go to plan check more often than office jobs: 27.1% against 15.8%. If you run a restaurant, allow for a review step when you plan the opening date.

How LADBS routes commercial HVAC permits

Most commercial jobs skip full plan check. Of 2,923 Commercial permits issued October 2025 through September 2026, 2,356 (80.6%) were Express Permits, 353 went through Regular Plan Check and 213 through Plan Check at Counter.

Ask bidders which route your scope will take, because plan check adds a review step. Compare permit rules across four cities in our HVAC permit guide.

Office build-outs drive downtown and Century City permits

Tenant improvements, the HVAC work in an office or shop build-out, are concentrated in the office districts. Across the city, 437 of 2,909 commercial HVAC permits (15%) from November 2025 to October 2026 describe a tenant improvement. In downtown's 90071 it was 36 of 69 (52%), and in Century City's 90067, 45 of 147 (31%).

ZIP codeAreaPermitsTenant improvementShare
90067Century City1474531%
90071Downtown, Bunker Hill693652%
90064West Los Angeles742534%
90012Downtown, Civic Center711115%
90045Westchester and LAX901112%
All of Los AngelesAll areas2,90943715%

Kitchen hoods appear on 255 permits (9%), mostly restaurant work, and VRF, split or heat pump systems on 319 (11%). We match "tenant improvement" or "TI" in each permit description, so the counts are a floor.

What this means for you: In an office tower, the landlord usually sets the rules for build-out HVAC work. Give every bidder the building's tenant work letter and the building engineer's contact, so they price the same conditions.

Recent Los Angeles project records

These are the newest Los Angeles HVAC permits issued in the last 30 days. Street addresses are withheld, owner names are masked, and each row links to the official dataset.

SignalLocation or agencyWhat the record saysKey date or figureStatus
PermitLos AngelesInstall direct vent heater · Filed cost on paid plansNov 21, 2026Issued
PermitLos AngelesReplacing two Gas/Electric central ducted systems with Heat Pump Central Ducted… · Ductwork · Filed cost on paid plansNov 21, 2026Issued
PermitLos AngelesHVAC replacement · Filed cost on paid plansNov 21, 2026Issued
PermitLos AngelesInstall new ventilation fans and associated ductwork. · Ductwork · Filed cost on paid plansNov 21, 2026Issued
PermitLos AngelesNew mini splits · Filed cost on paid plansNov 20, 2026Issued

Sign in to see 5 free signalsSee plans for full permit lists and CSV export

Title 24 energy rules for HVAC work

Title 24, Part 6 is California's Building Energy Efficiency Standards, written by the California Energy Commission. A permit application filed on or after January 1, 2026 must comply with the 2025 Energy Code.

Earlier applications follow the 2022 standards, which took effect January 1, 2023. Ask each bidder which edition applies to your filing date.

When Title 24 requires a mechanical acceptance test, a certified Acceptance Test Technician must perform it. Ask who will run the tests and sign the forms.

Energy rules vary by climate zone. Find your building's zone with the CEC climate zone tool.

EBEWE benchmarking and audit deadlines

EBEWE is Los Angeles's Existing Buildings Energy and Water Efficiency program. LADBS administers it in two parts: annual benchmarking and a five-year audit and retro-commissioning cycle.

It generally covers privately owned buildings of 20,000 square feet or more and City-owned buildings of 7,500 square feet or more. Check scope and exclusions in LAMC Section 91.9703.

Benchmarking is due June 1 each year for the prior calendar year, per LADBS Benchmarking FAQ9. Audits follow the last digit of the LADBS Building ID, per Ordinance 186789, Table 9708.2. Each group is due December 1 of its due year.

DateWhat is dueWhich buildings
June 1, every yearBenchmarking for the prior calendar yearCovered EBEWE buildings
December 1, 2026Audit and retro-commissioningBuilding ID ends in 0 or 1
December 1, 2027Audit and retro-commissioningBuilding ID ends in 2 or 3

The LADBS A/RCx FAQ1–2 confirms both dates. The 2025 EBEWE disclosure lists 2,235 building IDs in the 2026 group and 2,147 in the 2027 group.

So the 2026 group's deadline is December 1, 2026, and the 2027 group's is December 1, 2027. Retro-commissioning reviews how existing systems and controls run.

Check a contractor's C-20 license

C-20 is California's Warm-Air Heating, Ventilating and Air-Conditioning Contractor classification. CSLB's C-20 definition covers warm-air heating, heat pumps, ventilation, air conditioning, ducts, controls and filters.

Search the license number or business name in CSLB License Check. Match the legal business, status, expiration, classification, bond and workers' compensation to the proposal.

Ask each bidder who will pull the LADBS permit, book inspections and hand over closeout documents. Request current insurance certificates separately.

For commercial HVAC contractors

Use the permit's building use, area and date to decide which records to research. Check the current project stage before you reach out.

EBEWE groups give you a dated reason to contact a building. The 2026 group's audit date is December 1, 2026, and the 2027 group's is December 1, 2027.

FAQ

How many Los Angeles commercial HVAC permits are for tenant improvements?

About 1 in 7: 437 of 2,909 commercial HVAC permits from November 2025 to October 2026 describe a tenant improvement. Among ZIP codes with at least 30 permits, the share is highest in downtown's 90071 (52%) and West Los Angeles's 90064 (34%).

Who pulls the most commercial HVAC permits in Los Angeles?

None of the 2,909 commercial HVAC permits from November 2025 to October 2026 can be credited to a company, because LADBS mechanical permit records don't name the contractor. Check each bidder's C-20 license in CSLB instead.

How many commercial HVAC permits does Los Angeles issue a year?

LADBS issued 2,909 commercial HVAC permits from November 2025 to October 2026, about 242 a month. The count covers mechanical permits labeled Commercial.

How do I verify a Los Angeles HVAC contractor's license?

Check 6 items in CSLB License Check: legal business name, status, expiration, C-20 classification, bond and workers' compensation. Match each one to the written proposal. CSLB's county download listed 2,873 active, unexpired C-20 licenses with Los Angeles County addresses on October 22, 2026.

Do I need a permit to replace a commercial HVAC unit in Los Angeles?

Yes. LADBS requires a mechanical HVAC permit to install or modify heating and cooling systems, per LADBS Mechanical HVAC permits.

Does a restaurant kitchen hood need an HVAC permit in Los Angeles?

Yes. LADBS lists hood and ventilation systems under its mechanical HVAC permits. Give bidders the hood type so they can price the filing.

Who can pull an HVAC permit in Los Angeles?

A contractor with a C-20 license can apply online. An owner can apply as owner-builder with a signed declaration.

Where can I look up past HVAC permits on a Los Angeles property?

Search the address in LADBS PRISM, which lists building permits from 1905 to the present.

How much is an LADBS HVAC permit fee?

LADBS sets the final fee when you apply, using its published fee schedules.

Does EBEWE apply outside the City of Los Angeles?

No. EBEWE is a City of Los Angeles ordinance; other cities in Los Angeles County are not covered by it. Check scope in LAMC Section 91.9703.

Does an EBEWE building in the 2026 group still need its audit?

The disclosure list can't tell you. Check the building's filing, exemption or extension status with LADBS.